With the approach of Christmas and some sickness it was a quiet day at the Old Herring Factory. The hardy bunch that turned out spent their time on tool maintenance and cleaning. There has been no further progress on the boat door in the last week. Work should hopefully recommence early next week.
Friday, 15 December 2023
Friday, 8 December 2023
New Boat Door
The contractors have made some progress installing the new boat door. The steel frame was erected a couple of weeks ago but now we have a roller door installed and working, albeit manually powered only at the moment. The electric motor still has to be connected and some trim needs finishing as well as a bit of concrete work on the outside.
Friday, 1 December 2023
Waterlily gets riggged
Although not yet fully restored, Waterlily has been cleaned and repainted. Her sails were washed before being put into storage a long time ago, We felt it time we got all the pieces together and put the sails back up. The last time Waterlily had any sails on her was in August 2019. The nice thing about Waterlily is that she is small enough that we can rig her inside - a good thing given the temperature outside.
Friday, 24 November 2023
Reorg Day
The contractors had made no progress on the new boat door in the past week. However, in preparation for when we can get the bigger boats inside we started reorganising the small boats already inside and locating missing bits of rigging. Work was also started to clean up some of the bench tools which had some surface corrosion resulting from damp conditions at a previous location.
![]() |
| Waterlily - how do we rig her? |
![]() |
| Men at work |
Friday, 17 November 2023
Weight Lifting
![]() |
| Boat door frame |
![]() |
| Saga |
![]() |
| Shamrock |
![]() |
| Rewiring table saw switch |
![]() |
| Sand bagging |
![]() |
| Tightening tie down ropes |
Friday, 10 November 2023
No storm this week
More typical weather conditions prevailed through this week so normal work activities could be resumed. The electric motor removed from the table saw was reinstalled with a new drive belt and new wiring. Painting of White Wings, work on the re-decking of Saga and work on the keel of Shamrock continued.
![]() |
| Reinstalling the electric motor |
![]() |
| Painting White Wings |
![]() |
| Re-decking Saga |
Friday, 3 November 2023
After Storm CiarĂ¡n
Not much to say about this storm as it pretty much left Orkney alone. We had some more visitors this week at the Old Herring Factory who came along to see one of the boats that they donated was doing. A brief trip to check on some boats still stored at another location proved to be uneventful - everything being in order. Progress was made on the keel of Shamrock, painting of White Wings and on the table saw restoration.