More typical weather conditions prevailed through this week so normal work activities could be resumed. The electric motor removed from the table saw was reinstalled with a new drive belt and new wiring. Painting of White Wings, work on the re-decking of Saga and work on the keel of Shamrock continued.
![]() |
| Reinstalling the electric motor |
![]() |
| Painting White Wings |
![]() |
| Re-decking Saga |


