Friday, 28 March 2025

Just another day

Varnishing of Saga's internal woodwork has been completed.


Outside work continued on constructing a safety fence.



Friday, 21 March 2025

A new dinghy & more varnishing

A new dinghy has arrived. Known as the Grieve dinghy this boat was used at times as a tender to another of our historic vessels, Cingalee. We need to do work to replace the missing gunwale but the rest of the hull is not too bad. 



Some of the recreated internal fittings of Saga which have been test fitted have been removed for varnishing.


Friday, 14 March 2025

Safety Barrier & Feathers

Progress is being made with the construction of a safety barrier at the top of the new ramp leading up to the Boat Door. The fence posts have been postcrete'd into position. 

Elsewhere feathering has been put up around the edges of the Loading Bay door to dissuade birds from nesting on the top of the door roller mechanism. 


Friday, 7 March 2025

More Building Works

Putting up posts along the top edge of the gravel ramp side slope between which we will hang a rope to stop people falling down the slope. 

Putting up 'feather' strip to keep the birds out around the loading bay door.