Having moved a lighting circuit a week ago, work could now continue removing some more internal wall in order to widen the entrance to a side storage area. The wider entrance is required to make it easier to move boats on trailers in/out of the storage area.
Friday, 28 February 2025
Friday, 14 February 2025
Building Works
Today we had to move a light switch to allow for a section of internal wall to be re knocked out. The section below the red line will be cut out next week. This widens the entrance to this storage area.
Elsewhere work continues on preparing the underside of the catamaran Venture for repair and painting.Monday, 10 February 2025
Old Buoy Store Survey
The Old Buoy Store in Stromness has finally been surveyed as part of our feasibility study to find out if it can be utilised as an OHBS Boat Haven.
Friday, 7 February 2025
New boat
OHBS has received a new donation from South Walls. This is a small dinghy which at times served as a tender for another OHBS boat Cingalee.
Inside at the workshop we have started the process of widening the entrance into one of our side storage areas. This requires the removal of old stainless rails & sheeting previously used to mount a heavy insulated chiller door.
Saturday, 1 February 2025
Blue Prep
OHBS is in the Blue Door Charity Shop in Kirkwall 4-8th February so we are busy collecting items for sale. Today the bulk of the collected items were moved to the Orkney Sailing Club ready to be delivered to the Charity Shop next week.