Work continues on the construction of the work benches. Parts of the bench top are now being fabricated on the floor. The wooden handles of our old boat builder tools are receiving more oil. More redundant plumbing fittings have been removed to make more usable space available.
Friday, 24 February 2023
Wednesday, 22 February 2023
Workbench progress
Saturday, 18 February 2023
Storm Otto
While Storm Otto blow through Orkney with gusts of over 85 knots (97 mph) recorded at Black Craig & Sandy Hill most of the hardy OHBS volunteers still turned out for a mornings work at the Old Herring Factory. Others turned out the following day when the wind was just 7 knots :-)
Work on Shamrock has been continuing, a new knee has now been fitted to the stern board![]() |
| Old port knee |
![]() |
| New starboard knee |
Wednesday, 15 February 2023
Workbenches
Friday, 10 February 2023
More of the same
While one crew concentrated on facility improvements; removing unwanted factory piping and installing new electrical outlets, another crew continued work on boat and tool renovation.
![]() |
| Working on Shamrock |
Friday, 3 February 2023
New sign, fire points, cable reel...
We now have a sign by the side entrance door so people can find us more easily.
Work on the new fire points is now complete and the new Water Mist Extinguishers are in position and ready for use should they ever be required.
A new cable reel has been installed off a supporting steel column to provide 240v electricity to the central work area. Further work is planned to add more 240v socket points around the storage area.
The area near where the new boat door is to be fitted has been cleared in preparation for work to begin on the installation of the door.
![]() |
| A ready to go extinguisher |
![]() |
| The new cable reel |














