Friday, 25 March 2022

Second Section

The second piece of decking, this time the aft port panel was today glued down on Saga. We don't have enough weights and clamps to allow us to glue more than a single panel at a time so we are spreading the glue-ups over the weekly visits to the workshop. Having set down the second panel we also trimmed up the forward starboard panel where it will join the already fixed stern panel.



Friday, 18 March 2022

What's Going On Here?

These are dust sheets protecting the new decking on Saga. However underneath these dust sheets we have started gluing down the new decking sheets. The humps and bumps visible in the dust sheet are clamps holding one of the new decks sheets in position while the glue sets. We are a using a more traditional type of wood glue; Cascamite - a powdered resin wood glue. Only three more sheets to go...

Saga
Linda is looking very smart with oars and flooring now smartened up. Linda will also need a dust sheet to keep her looking her best.
Linda
 


Friday, 11 March 2022

A change of location

For a change of scene some of our volunteers spent today working on the dinghy Shamrock which is currently in storage at a separate location. Work is continuing to replace rotten thafts, capping rail and top boards.

Shamrock

Shamrock
Other volunteers were continuing work on Nellie and Linda at another location.

Nellie
Linda
Linda 



Sunday, 6 March 2022

Further trimming

Today both of the aft boards of Saga were trimmed to length. There will be a join in the middle of the boat where the aft and forward boards meet. In preparation for being glued to the hull the aft boards have been trimmed where they will contact the stern board and the forward boards. The sides will be trimmed once the boards have been glued into place.