Last week a lot of volunteers were unavailable; vacation, sailing or whatever but things started returning to normal this week.
A discussion on what to do next with Nellie occupied some time. The discussion revolved around how we could best display the steam engine and boiler. While ashore the boiler is far too heavy to leave in the boat without special support but we could possibly re-install the steam engine.
Further work was identified on Laverne. A thaft requires replacing as do a number of ribs.
Work continues on Saga. This week the rudder fittings (pintel and gudgeon) were re-installed and measurements taken for re-installation a metal strip on the aft end of the centreboard case and also the chainplates.