The contractors have made some progress with the installation of the large boat door. The supporting metal frame has been installed on the inside of the building. Inside Saga is having new rubbing strakes attached and the keel of Shamrock is about ready for a new keel band. The table saw refurb is just about completed having been rewired and a new drive belt installed. Outside with little wind and even a bit of sun we spent some time adding more tie down ropes to the boats in the compound. This involved tying ropes lashed to the boats to pallets on the ground which were then loaded with sandbags.
Boat door frame

Saga

Shamrock

Rewiring table saw switch

Sand bagging

Tightening tie down ropes