Friday, 13 September 2024

New Boat Door is almost finished

The new boat door which was installed at the end of 2023 has finally had the missing trim fitted. All that remains now is for us to run a bead of sealant along the exterior trim edges.

At another location the Norwegian Lifeboat "AKL" has been moved outside so that she can be lifted and moved to the Old Herring Factory.