Friday, 5 April 2024

Infrastructure & Paint

The table saw now has an extraction adapter so that we can extract using either a 100mm pipe or a smaller 50mm shop vac hose. A 2-gang power socket which supply the tools had broken so a replacement was obtained and fitted.


Elsewhere Nellie was getting her underside painted. We used ordinary domestic paint rather than anti-fouling paint as Nellie won't be going anywhere near water any time soon.


Work continued on Saga's new deck with the centreline covers being glued down.