During the last few days progress has been made on the new boat door. The old concrete footing has been removed and a new concrete ramp installed. There is still some more concrete work to be done and the trim still needs to be added to protect the wall edges. Today the electrician installed a 3 phase supply to the door switch/motor. The door still needs commissioning which entails setting the open & closed limits.
Work has started on converting an old sink unit into a utility work bench using some spare materials we have left over from a previous job.
Both White Wings and Shamrock received some more paint today.
We have received a number of collapsible fish boxes and some trolleys to move them. These boxes will be used to store bits-n-pieces associated with a particular boat so that the bits don't get separated in the workshop.