With a break in the snow, albeit still very cold, we moved several more of the smaller boats and a number of pallets of marine artefacts from Ness to the Old Herring Factory. Again a lorry with a crane was used as this could lift all the heavy items. We haven't yet decided on how best to arrange the boats for storage, so it is simply a case of off-loading them and leaving them in the middle of the available space for the time being.
| Linda ready for up lifting |
| Preping Linda for the lift |
| Labradorite rock (ballast) being up lifted |
| Saga ready for moving |
| Waterlily, Linda & Saga off loaded |