With Saga moved away from the main storage shed ready for winter work to begin it was necessary to locate and move all the bits previously removed from Saga. This became a game of find and seek as we search high and low to find all the missing bits. Fortuantely we have a policy of labelling all items removed from a boat so that we can eventually return fittings to their original boat.
Work also continued cleaning out the interior of Linda - the scrapped interior was washed in prepapration for repainting.