Friday, 7 August 2026

It's wet

Rain today so time to check on the boats we have in storage at an off-site location. They are still covered and appear ok although some trailer tyres require a bit more air.


Pearl got given an extra tarpaulin to cover the exposed part.


Back at the Old Herring Factory we started on a boat and trailer reorganisation. Some boats were moved outside while other work went on inside.



Friday, 31 July 2026

Quiet Summer Time

Work slows down during the summer months as volunteers go away are on holiday. 

We spent a while separating out scrap materials and pulling up weeds outside.


Work is continuing on the elliptical stern yole Laverne



Friday, 10 July 2026

Odds and Sods week

Several of our overhead light strips have stopped working but many are not easily accessible because of the boats stored underneath them. However, we managed to make enough space to fix one unit.


A final coat of paint was applied to Venture's rudders and dagger boards.



Friday, 3 July 2026

Finishing things off

The centre board on Saga has finally been rigged with an arrangement that is representative of what it would have originally looked like. The original centre board was steel and heavy so required some mechanical assistance to lift it.

Blocks for the main sheet have also been attached although we haven't pulled the mainsheet in as this would make manoeuvring the boom more difficult.


Finishing touches were made to the Groat dingy.



Discussion about where the various fittings went on Venture.


Fitting the wheels to one of the new dinghy frames.



Friday, 26 June 2026

Space Manegement

Storage space is always a problem as we do not have enough of it. We have already constructed a number of steel frames to allow some of the smaller boats to be double stacked but we really needed more frames. Two more steel frames have now been constructed with a wider spread which will allow further boats to be stacked. This week the frames were getting painted, wheels will then be fitted and the frames will then be ready for use.





Friday, 19 June 2026

It's Getting Hot

As the next heat wave hits the country, 15C in Orkney, work on Venture includes painting of dagger boards and rudders and sorting through the fittings to see what goes where on the hulls.



Following a visit from members of UHI (University of the Highlands and Islands) to catalogue the Labradorite stones have in our care, we have put the stones back in storage.

While the weather outside was not too bad we did some weeding.




Wednesday, 17 June 2026

Aldis Lamp