Friday, 9 October 2026

Grant Funding Work

OHBS recently received a significant grant from the North Highlands Initiative to enable us to replace all our internal fluorescent lighting with more efficient LED lights. About a quarter of our 45+ fluorescent units had failed anyway and now that it is no longer possible to obtain replacement fluorescent tubes in the UK it was time for a change. The first light was replaced today.


The paint applied to the Groat dinghy last week was sanded back today in preparation for a second coat.



Work continues on replacing the thafts on Laverne.


Friday, 2 October 2026

Back to Work

Now that all the wood work on the Groat dinghy has been finished we could move on to the next stage - painting. The painting crew started with a survey of the boat to figure what work was needed, what needed masking off and what colours to use.


Painting continues on the elliptical stern yole Laverne and work is underway to replace some of the interior boards which were too rotted.


It's not all work - tea break...


Having sorted out the plan, painting started on the Groat dinghy.

Friday, 25 September 2026

New Fleet Member

OHBS has acquired a Light Speed Boat built by Duncan's at Burray in the 1930's. This boat doesn't have a name so it will be known as "Light Speed Boat". Length 13' 6" and beam 4' 5". More information here





Friday, 18 September 2026

Back to Work

Discussions on what goes where inside Laverne


and painting on Laverne.


In another part of the workshop we removed some redundant chiller ducking to allow us better access to the service space between the floors. The service space is only about 1m between the floors and full of cabling, piping and large ducking so a bit of an assault course.

Wood machining taking place = lots of sawdust generated and no we do not have a wood burning stove.


Pumping rain water out of the AKL lifeboat which is still outside in the compound.


No work on the Groat dinghy this week but she is looking good.

Friday, 11 September 2026

Tetris with Boats

More boats have been put back onto trailers so that we can more easily move them around. First Cingalee was moved then some of the smaller boats.


Once moved it was possible to see inside Cingalee. Ok, we still haven't finished the flooring...


Elsewhere boats are on the move.




Friday, 4 September 2026

Wet-n-Windy

The weather is not so good today so it was spent moving more boats around. Cingalee was put back on a trailer so that she could be moved out of the workshop and in turn allow us to move a couple of the smaller boats which we have finished work on.




Elsewhere work on the Groat dinghy has moved forward. There is a new section of flooring now complementing the existing section at the other end.


Friday, 28 August 2026

Quiet Time

It's that time during the summer when a lot of volunteers are away on other activities. Those remaining  are reorganising trailers fitted to a couple of the larger boats so that we can more easily move them to allow us to then move some of the smaller boats. 


We also have several failed lighting units which need fixing and these can not be accessed with boats underneath them.