For the past 5 years OHBS has had a small display of artefacts and information in the windows of an empty shop in Stromness. The shop is about to be leased out so OHBS has had to remove the display items from the shop.
| Going |
| Going |
| Gone |
The 50 year old compressor we acquired is not worth keeping so we have dismantled it into manageable parts for recycling.
The various parts of Nellie's steam boiler and engine are coming together in the hull. One of the most important parts of the installation was the tea maker. This is a mug sized coil fed with steam from the boiler which could boil the water in a mug in 7 seconds.
A new boat has joined the Orkney historic fleet at the Old Herring Factory. This is Pearl II (we already have a Pearl so this is number two). Pearl II arrived a few days ago from Shapinsay.
Pearl II arrived with a collection of boat building tools.
| Stern tube boring cutters & saw |
| Tool box with lots of clamps & other tools |
Elsewhere work continues on rebuilding Nellie's engine & boiler.
We were given a 50 year old compressor which was not in a particularly good state of repair. While the unit did produce compressed air it needed a fair amount of refurbishment. We do not have a requirement for a medium sized compressor, as we never use them, so we think that this one will be getting recycled.
A new latch lever has been made for the large bandsaw to replace one that was missing. This means we can now properly latch the motor compartment.
Outside the WW2 lifeboat AKL has collected some rain water, we will pump this our next week.