We brought out the big guns to remove some more old internal wall concrete footings that were getting in the way.
After removing the rubble things looked a lot tidier.
Elsewhere Laverne received a primer coat on her deck.
We brought out the big guns to remove some more old internal wall concrete footings that were getting in the way.
An OHBS volunteer saved a couple of electrical items from the tip. These items have now been checked and repaired and are good for work. We acquired a 110v site transformer and a 12v battery charger/booster.
Nellie's reinstalled steam engine.
Not the best weather for outside work so we remained inside. Once of the steam engines belonging to Nellie was lifted back inside the hull.
As the first storm of the winter approaches Orkney we have made sure that everything outside is secured as wind gusts in excess of 65 kts are forecast for Saturday.
Inside restoration work continues